North China
Ulanqab
Building a Low-Carbon Computing Power Smart Center around "Source-Load Interaction" Total land area is approximately 100 acres, total floor area is approximately 75,000 square meters, with a designed IT computing power load of 80MW.
Datong
Developing a Big Data Comprehensive Industrial Cluster with "Carbon Neutrality" as the Concept Total land area is approximately 1,000 acres, total floor area is approximately 311,400 square meters, with a designed IT computing power load of 500MW.